Penerbit: Faculty of Engineering University of Lampung
P-ISSN: -
E-ISSN: 2549-3442
DOI: 10.23960/elc
Fakultas Teknik Teknik (semua kategori) Arsitektur
Artikel (87)
Perancangan dan Simulasi Sistem Kompresi Suara dengan Transformasi DCT
This paper discuss design of sound compression system using VHDL syntax, XACT tools step 6.0, Xilinx Inc. and Proseries View Logic System. This process covered entry design, simulation by functionally or static clock. The compression system using the maximum clock frequency 2,8 MHz. The simula...
Electrician : Jurnal Rekayasa dan Teknologi Elektro; Vol. 2 No. 1 (2008); 55-67 | 2012
Analisis Karakteristik Gangguan Hubung Singkat Antar Belitan Transformator Menggunakan Transformasi Wavelet Diskrit
Transient fault could occur on transformer in power system. This is could be because of internal fault or external fault. Disturbance could be because of short circuit between winding of transformer or because of short circuit on load. Short circuit on transformer winding could lead to catastrophic ...
Electrician : Jurnal Rekayasa dan Teknologi Elektro; Vol. 2 No. 1 (2008); 48-54 | 2012
Implementasi Dt-51 Minsys Sebagai Pengendali Pony Binder Di PT. Dian Rakyat 2 Pulogadung-Jakarta Timur
Have been successfully made at PT. Dian Rakyat 2 Industrial Estate Pulogadung, East Jakarta, a microcontroller based controller for pony binder machine by implementing DT-51 MinSys Ver 3.3 as it main controller. By replacing the previous contactor based controller with microcontroller based controll...
Electrician : Jurnal Rekayasa dan Teknologi Elektro; Vol. 2 No. 1 (2008); 33-47 | 2012
Rancang Bangun Sistem Kendali Suhu Dan Kelembaban Udara Penetas Ayam Berbasis PLC (Programmable Logic Controller)
Electrician : Jurnal Rekayasa dan Teknologi Elektro; Vol. 2 No. 1 (2008); 25-32 | 2012
Simulasi Busur Api (ARC) Pada Pemutus Daya (Circuit Breaker) Dengan Menggunakan Program Matlab Simulink
When circuit breaker interrupt the current then the arc would occur. Before current interrupted, the fault current flows between contactors of circuit breaker. Because the small of resistance value of circuit breaker channel and then as a consequence the current results a new voltage at contactors o...
Electrician : Jurnal Rekayasa dan Teknologi Elektro; Vol. 2 No. 1 (2008); 17-24 | 2012
Rancang Bangun Model Sistem Pemantauan Tinggi Muka Air Sungai Menggunakan Telemetri Radio
The early warning system of flood is used to prevent and minimize a damage to be happened. The primary element for the early warning system is water level of river, using distance measurement based on ultrasonic wave. The objective of this research is to make an instrument that functioned to measure...
Electrician : Jurnal Rekayasa dan Teknologi Elektro; Vol. 2 No. 1 (2008); 5-16 | 2012
Conveyor Simulation of ER Performer MK2 Robot
Robot simulation softwares are usually required by designers or engineers to model a robotic work-cell, simulate its operation, and program the robot before operating it in its real situation. One of the most powerful CAD/CAM robot simulation softwares is CATIA, a product name developed by Dassault ...
Electrician : Jurnal Rekayasa dan Teknologi Elektro; Vol. 2 No. 1 (2008); 1-4 | 2012